Tuesday, November 16, 2010

One method of construction of artesian wells

This article describes a method for construction of artesian wells. Using this method allows you to save significant time and money

Under the conditions of their stay in the city, in an apartment with utilities, water supply is no problems. But at the cottage or in the private sector, are forced to drill boreholes for water supply guaranteed - under water-immersion electropumps type kid, or SPRING. The cost of drilling one running meter, together with supplies is already about 2tys.rub. If the contract is cheaper? Consider it lucky.

In principle and driving well his grandfather way. This is when they get together three or four men, nehily stature and drive the pipe into the ground a sledgehammer blows, weighing pounds 8-10. The effectiveness of such work leaves much to be desired. Each participant will hit 10 - 15 strokes, and then the next. And so for a long time. Well if the aquifer is shallow, 3-4 m from ground level. And what if the water is 6 meters and deeper? The question of how states irrelevant.

To reduce the cost and accelerate the water problem is proposed to produce a simple device for plugging a well in all conditions. At the request of the owner, can pile well as in the courtyard of the plot, and in the room.

In financial terms, the cost of driving one meter of wells in the amount of the cost of consumables is significantly lower than the use of portable drilling device. And not every setting can be accommodated in the room. And if you want is possible and private businesses to pile boreholes and providing water to all comers.

You must first make a tube-water intake. In the lower part, which is welded to the cone. The diameter of the skirt, which is equal to two diameters of pipe used. Usually used for this pipe with a diameter of 25 mm, ie, inch, preferably galvanized. Ideally, perhaps, and the use of stainless steel pipes, but the cost of its construction, in this case the increase. Water intake on the length of drill holes with a diameter of 2-3 mm in random order. Then the water intake pipe wrap wire mesh with a mesh size of 1-2 mm to filter water from the sand and secure. At the top of the water intake should implement cutting the connecting threads. The length of the pipe should be no longer than three-quarters the height of the tripod. To prevent the suction of the air pipe connected to the winding and dyeing bolting any thickened oil paint.

Followed by manufacture so-called "shock Babu" weighing 15-20 kilograms. The center is on the lathe to drill a hole 2mm larger than that used for driving a pipe. Top drilled two holes. Then they be threaded for eyebolts, which binds sufficiently strong rope. In order to avoid damage during pile sleeve, the tube puts the so-called podbabnik.

After that, over the alleged location of future wells installed tripod made of pipes. But perhaps a sufficiently strong wooden bars. To which, quite firmly attached eyelets.

After the "shock baba" is put on the pipe string and the process went as they say. Lifted load and dramatically lowered. Thus, the pile borehole for water depth 11metrov at a height of 4 meters of water column during summer and in winter, 2.5 meters, had spent about one day. With breaks for lunch and smoke breaks and other economic affairs. But the evening began pumping water.

Since then, it took many years. Total financial expenses amounted to about 3 TR together with the cost of a hand pump. A construction of an artesian well at that time would have cost in the 11 TR The benefit is obvious. Yes, and 3 wells were scored as an aid to neighbors. The cost of consumables for the construction of wells has paid off completely for driving the two wells to a depth of 9 meters. Time spent on plugging wells since the installation of the tripod to start pumping the water was 5 hours. And this without any help!