Thus, the foundation is made, it is time to collect the carcass. First of all, I vystelil foundation gidrostekloizolom to prevent infiltration of moisture from the metal pedestal on wood.

Then you buy planks were cut blanks for the future framework and treated with antiseptic. Further, it is time to build. A little effort - and the carcass turned out like this (pictured). When assembling board used 100h40, screws and nooks.

The resulting frame screws pulled to the pedestal (in the first part of the story, I mentioned that this was pre-drilled holes in the metal frame basement).

The foundation has turned raised above the ground about 30 cm, then this difference will disappear blind area. As you can see, the exterior walls on two sides, I decided to do a reverse slope to the final design did not look kind of "box".

Next was purchased plain wooden door, covered with an antiseptic and is in place, and the frame was trimmed edging board 100h25. Naturally, all boards are also coated with an antiseptic before installing. The resulting design is shown in the photo.

Board, as usual, were on sale raw, so screwed into place without gaps. Subsequently, as the drying of wood, formed strange gap for ventilation buildings. Then, when it comes to finishing exterior (eg, siding) - these gaps will close.

The only mistake I made at this stage - it's too tight fit door in a box - had to leave the target in place of the porch, a little more. Rainy weather this summer has shown the door after the rains perfectly swell and wedging in a box. However, then I'll take a plane and just take off a few millimeters from the end of the door, thereby eliminating this problem.

Roof - where do without it? I did not want a simple single-pitch or gable roof, so I took a volitional decision to experiment with a hipped roof.

Skeleton of such a roof has been pre-assembled on land and only then set in place. The sequence of actions tried to pass, as usual - with a photo.

High upper gambrel roof was designed specifically for the vane (which was subsequently installed and also subsequently successfully stale someone from the local punks).

In the third part of the paper will continue about the roof, and I'll tell you, as there was construction, if one considers that during the construction process has been radically revised approach to the applicable roofing materials. In general, going through Hell, Part Three

If you have any questions - ask in the comments in subsequent articles will try to cover everything.

To be continued. Good luck on the construction site!