Tuesday, November 16, 2010

Trying to cut slabs of the foundation. Day One

My husband and I are building a frame house. Building a second season.

Over the past year did the foundation and blocked one half of the plates, while the other half did not have time, the crane was unable to drive.

And this season, decided to start building with the overlap of the second half of the foundation.

And it began with curiosities. It was necessary to block the second half of the house, you need a crane.

Planned to tap for Thursday, but it was May Day holidays, which came suddenly.

Agreed on Sunday 4 May. After dinner came crane "Kato" 18 tonniki, and we did not know that last year a huge pit to play with us a cruel joke


He rose to the very dry and compacted space. The first thing decided to put the balance beam under the porch to the prepared place. Became the crane to carry the beam along the basement, I stood at the side and watched the process. So in my eyes back support crane begin to leave the ground and tap stands on end. Front wheels stuck at 2 meters from the ground.

When the crane took his normal position by means of what a clever manipulation, began to look for bed-pillow under the footing and the iron lining. They were not, they went to ground ... We started to dig this stuff out of the ground and found that after 30 cm more or less on dry land was a clay slurry. Two hours trying to pull this stuff out of the ground, pulled to the efforts of this zhizhy lining. Crane collapsed just in a place where there was a pit dug on 4 extra meters.

After these adventures have decided to move closer slabs. But this new crane, the computer is not regulated, and he could not move the slab, in principle, could not even pick them up - permanently cut off the computer. Then ask him to move the slab, which was put in that year, but not to the place .. Nudge it had only half a meter in one plane.

The outcome of this day - nothing has been done and uronennaya stove in the basement.

No comments: