Tuesday, November 16, 2010

House from scratch

His house on the old dacha began building two years ago. Quantified how much it will cost us, we do not take into account a lot of things and now, two years later, with the present experience, vryat Would got involved in this adventure. So much had shoveled by the information and materials, and construction, how many spent money and effort, a lot of things in my life had to give a very reduced visual communication with friends. But everything is in order.


Since the area is very narrow, maximum width of 14 meters, then dug a lot of sites, but found the house project 7.8 x 10 8, which we arranged on a lay. Bought the project, design it and building permits in the "architecture" of our area, because we are law-abiding people.

And we began our "headache" with the construction of this house. Initially, after reading that advised people in the know, we decided to monitor the entire construction process itself, since the price and control of firms engaged in this, we have not arranged (for reviews of friends), and therefore, each phase of construction had to learn to know that demand from builders. Construction crews worked at us different, but it's a separate issue and, perhaps, I thought of them and then somehow write.

First in the project provided the ground floor and it's great, because we also did not want to clutter up my already small area (8 hectare) in different buildings and we wanted to put everything back rooms in the basement, but it was not there. Since the site is located in a valley and ground water closely, to make a basement into the impossible, we had to build it on the surface and therefore to think about the new foundation. Have chosen a monolithic slab foundation, began looking for information about him. Two years ago, information about it were not so many, many frightened a great price and its prudence of construction is not a swamp, but we have not retreated from his desires, and so far have not regretted. The house stands on a single plate, and if there will be some perturbation of the ground, the house should not lead.

Second: Originally wanted to build a gas concrete "Hebel", like they wanted to save money, but at the moment to buy it on the line, the factory was a huge queue, and prices have risen so that the brick was not much more expensive. In the end, built of brick. Brick for interior walls (double-hollow) took Vladimirsky, because it is very convenient: the first order, and when brought to the site - to pay. First ordered some other brick (now I really do not remember whose), brought "sucks", not taken, and Vladimir was very worthy.

And to take a brick veneer on Losinoostrovskaya factory, since they produce only 75 cycles of frost resistance of bricks. With his number really miscalculated, after building his house is still left with the car, but that's because all the first time. If an internal brick, we took as its consumption, then the tile had to be taken immediately to the house, not to play the color. Need to calculate carefully. Comparing the prices of brick and gazabeton we obsolyutno forgot insulation, but it's extra money for the material itself, yet the net for a bunch of working brick, insulation and finishing brick and even for work (This is the question of those little things that we forgot when rendering estimates).

Began the construction of the box itself at home, faced with too many problems. Incidentally, during the construction of the walls we really helped http://www.forumhouse.ru, where we subtracted the space ventilated walls and have used it in construction. When they got to the windows, we decided to make them a quarter for beauty, but later during the installation of plastic windows, it turned out that it was not necessary to do a quarter underneath. We knew nothing about it, but builders still being told, so they did. And now we would not have done a quarter, especially in the basement where the windows and so small as light window decreases.

While built ground floor, pondering over the floors. Read and pondered the pros and cons and wooden block floors. Stopped on the block. First - they've made in the factory, which means there is a guarantee of quality. Secondly - are set for one day. In the third-longest serving and the inner emptiness can be used for the construction of any communications. Fourth - you can just continue to build a house on. Finally ordered a reinforced concrete slab at number 17, but again, we all need to carefully calculate. We have in the project were miscalculations slabs and so we were simpler. The date of the board, ordered a crane and plate immediately removed from the machine on the wall. It turned out pretty fast. Tip: When placed plates, armopoyas smeared with liquid cement. Plate lay flatter, not squeezing the right cement.

The description of our future victories and blunders later. Photo failed to insert, try the following message.