In continuation of the story about how building the foundation of the series "House with his own hands."

Construction began with the preparation of the surface grillage, for this first had to spend quite a decent volume of work on the installation of formwork, encircling the entire tape in a circle (one tablet on the 150), aligned precisely formwork on hydraulic level, then, as the wall tape were not perfectly smooth (because of the roofing material, its waviness during installation!) then prepared a solution of 1 to 3 (cement sand) with less water, and slipped with the top flush with the formwork, forming as it were, the tub, then in this bath did more liquid mortar screed, immediately zaglazhivaya plastering trowel, then hid the film and constantly watered.



coupling

Ties began after waterproofing for roofing strips of sliced lengthwise, then bitumen primer, diluted dizelkoy smeared with a thick fat layer of foundation surface and the surrounding strip of roofing material had to be glued, not by rolling a stick half, otherwise it tries to escape in the direction of a fix is already difficult bitumen does not give a gas burner and the balloon as it was not on hand so I had poizgalyatsya so glued 2 layers of roofing material


Waterproofing

Completely blocked the entire tape with overlap not less than 50 cm, the missed extra to not take off


Ready waterproofing

Meanwhile, given the fluff, ie not really in a hurry to purchase in advance (the main trouble is my own) quietly went to buy the blocks well and as expected, what I wanted, there was no (concrete, foam concrete is a major company) - all I had to wait 3-4 months! I had to take what they give, and then took the last of me already ran - he has not got, that's such a rush! Ie blocks mark 700 has delivered, unloaded inside the basement, so as not to pull away!


foam blocks

Overlaid on a continuous mortar M100 1 row, began to put two series, tentatively proarmiroval plastic ties (garbage left on the packing blocks, but very strong, remembering the plastic plaster mesh, I decided to put her in it !!!!), joint solution goes to air gap, for this prepared a special rack to the size of a block length and 12 mm thick, spreading the solution on the rail, the block if the previous number was exactly laid out, almost upsetting, and once stood as expected, the end of the block plastered all over, then striking a trowel, separated in the middle part of the solution, forming a vertical gap, the gap is the interruption of cold bridge in the weld stack (very thick seams of the poor geometry of the unit), each block is pre-wetted with water from a bottle.


laying out a series of

That way was packing tape, clearly visible gaps in joints, can of course from the tape and not much sense, but better with it than without it altogether


Tape and clearances

That is, quietly, eyes and hands do fear, have grown for 2 series, on his work a pleasure to watch, especially with ponimaeniem that broke away from the ground up and grow up!


2, some already ..

On the third series of stacked masonry grid, 3 mm, with releases for future washroom partitions


Mesh Mason

Beginning 4 series, is seen opening the door for future


3 a number of ready

All blocks are spread under the twine, to pre-stretch tow, was 4 corner of hydraulics and Scribbles on the corner - the seam thicker or thinner, then laid cornerstones (taking the most high-quality block) and pull the string, this operation for every row!

Began to window openings, the eye is pleased, happy with the hand (fewer blocks in a row !!!!)


Home Window

Blocks to raise it becomes harder and parishes of the forest from the inside


already high

Meanwhile, it was cool that I cheated in volumes, I do not know how and what do not remember, but somewhere crept cool bug, bought another block stacked local Dzhamshut, laid out the extreme blocks lined, preparing formwork and fill the jumper over the windows


extreme blocks

Laid out the remnants of units manufactured formwork for bridges (on the left shows) began to pour, stirrer and a generator on the ready (power then netuti, forgot to say Uvazhemym readers)



Set up under a large window of formwork, propped stops, secured


jumper

That is so arranged inside the jumper, it AIII 3 rod 10 mm, 4 mm wire to strengthen the pieces of foam block (napilil first saw), and higher quality of reinforcement, the reliance on a block of about 30 cm, so concrete slab bridge will be a great bridge to the cold Future


inside jumper

In a week filled all jumpers, helped husband, put a bucket on a rope concrete, and I poured on top and shtykoval, neighboring Dzhamshut saw me jumping from one bucket, sought to work steep money had been sent to Allah and all hell ihnim and not sorry he did much better quality than they would here navayal!


wall ready

After that hid ruberoid top of the wall, pressed brick, and left the house to spend the winter. In the next story in this series "House with their hands" would be a story about the construction of the attic floor, then we reach up to the roof! "