Hello!

Decided to tell about the construction of his house. Did not work out with the purchase of new apartments in Moscow and decided to build a new home near her house, which in part Zagoryanka Moscow region.

First. I did it chose the project that first sketch, an example of his plot to fit, then spent geology, geodesy and ordered a working draft to pay 500 euros and got 3 copies.


Launched a tender for construction companies for which scanned the basic scheme and project description and began to attach to e-mail with a proposal on cost estimation of construction. Those organizations that asked for money for budgeting immediately refused. As a result, has received a number of commercial proposals deserve attention. Decided to divide the construction of stage 1 - foundations (basements, basement)

2-box (walls, roof) 3-finishing (plaster, communication, etc.).

One of the organizations invited to make a foundation and ground floor of a very nice price, to which I agreed, and by the end of February 2008 to April of this year received the ground floor, in the construction process was a lot of trouble related to pouring the concrete and other work. But under the threat of physical violence all the flaws have been eliminated.

After which the organization to the proposal of building the box received a blank refusal. Started a new tender for construction of the box, as a result of his vygral citizen of Belarus on behalf of Acne with a brigade of their countrymen-time gamekeepers the Bialowieza Forest. Box they built very quickly for the benefit of monthly building material - porous concrete 500h600h250 Hebel, metal roofing, then plastered the entire house (front and inside) and carried out the wiring. Here that and show them the best quality.

According to their calculations the area of the walls of the house more than 1100 sq.m. but after he was measured the 800 square meters. m. As they say trust but verify. As a result, right now I have a team of civil engineering works 3 insulated roof, building a rough ceiling and stuff. So now the other team makes heating, water, itp Until all.